| 3 Year Guarantee |
| Aesthetically pleasing deign |
| Box section construction which makes the unit exceptionally sturdy & durable |
| N.B. A Fork Lift will be needed to unload these units. The unit must be securely bolted to the wall & floor. Wall/Floor fixing bolts are not supplied with the unit |
| On site construction available - ask for details |
| Powder coated green |
| The roof is made up of 16mm thick triple wall polycarbonate sheet & front capping of 1mm galvanised sheet steel |
| The unit comes with two upright supports & additional option of fill in end panels clad with 16mm triple wall polycarbonate sheeting |
| UK Manufactured |